bridaluf.blogg.se

Mdt road conditions
Mdt road conditions











mdt road conditions

Utility work between K St and Spruce Rd for 59.6 km (Hope to 27 km south of Jackass Mountain Summit).

mdt road conditions

Alternating lane closures in both directions. Paving operations between Annis Rd and Exit 135 for 6.1 km (Chilliwack). From 8:30 PM to 5:30 AM PST on weekdays and Saturday. Road construction work between 208 St and Exit 73 for 12.8 km (Langley - District). From 7:30 PM to 5:00 AM PST on weekdays and Saturday. Road construction work between Exit 73 and 208 St for 12.8 km (Langley - District). Construction work between Glover Rd and 248 St for 3.9 km (Langley - District). Road construction work between Exit 73 and 208 St for 11.8 km (Langley - District). Utility work between 208 St and Exit 73 for 11.8 km (Langley - District). Road construction work between 208 St and Exit 73 for 11.8 km (Langley - District). Bridge maintenance planned between Glover Rd and Exit 58: 200 St for 5.4 km (Langley - District). Watch for equipment and workers on the shoulder. Eastbound exit ramp to 200th Street will be reduced to one lane. Construction work between Exit 55: 192 St and Exit 58: 200 St (Langley - District). Utility work between Exit 150: 160 St and Exit 53: 176th St / Highway 15 (Surrey). Utility work planned between Exit 150: 160 St and Exit 53: 176th St / Highway 15 (Surrey). From 7:00 PM to 10:00 AM PST on Saturday and from 7:00 PM to 7:00 AM PST on weekdays. Maintenance between Exit 49: 156 St and Exit 53: 176th St / Highway 15 for 4.3 km (Surrey). From 10:00 AM to 2:00 PM PST on weekdays. Tree pruning planned between Exit 4: Headland Dr and Exit 8: Cypress Bowl Rd for 4.2 km (West Vancouver). Limited visibility with fog between Somenos Rd and Horseshoe Bay Ferry Terminal for 42.0 km. Maintenance between Cobble Hill Rd and Wilmot Rd for 8.0 km (Cobble Hill to Mill Bay). Highway 1 (on Vancouver Island), in both directions. Starting Wed Feb 2 at 8:00 AM PST until Wed Feb 2 at 4:00 PM PST. Utility work planned between Deloume Rd and Cobble Hill Rd for 0.6 km (Mill Bay). Limited visibility dense fog between Shawnigan Lake Rd and Mt Sicker Rd for 43.0 km (4 km south of Malahat Summit to 2 km south of Chemainus). Construction work between Exit 16: Leigh Rd and Wellswood Rd for 4.8 km (Langford). From 7:00 PM to 5:00 AM PST on Thursday and Friday. Paving operations between Finlayson Arm Rd and Wellswood Rd for 4.3 km (Goldstream Provincial Park to 1 km north of Langford). Tree pruning between Herd Road and Drinkwater Road. Alternate route is available via Hwy 95 and Hwy 93S. Overnight closures 10PM-7AM MST Sun-Fri night. Starting Jan 10 single lane alternating traffic will be in effect 9AM-3PM MST Mon-Sat. Road construction work between Golden Donald Upper Rd and Yoho Bridge for 4.9 km (2 to 7 km east of Golden). Next update time Fri Jan 28 at 12:00 PM PST. Road open with sections of single lane alternating traffic. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit).













Mdt road conditions